Home /Hilton Garden Inn T2 Heathrow.
This development consisted of 361 guest rooms over 13 floors. This was the first Hotel with a direct
connection to Terminal 2 Heathrow. Although this development was not airside it fell within the
Heathrow Security Zone and as such, we were required to comply with Heathrow Airport Logistics
policy on materials and tools. No items were allowed to be delivered directly to the construction
site and had to all go through the Heathrow Airport distribution centre at Colnbrook.
We were responsible for the guest room, corridor and Back of house area fit out including all carpentry,
decoration, Tiling, Waterproofing, guest room Plumbing & Electrics along with external lighting. The rooms were
all wallpapered with a fully finished skirting. The bathrooms used two different coloured wall tiles with a granite
floor and vanity with the DDA rooms having rocktop anti slip tiles.